Poland - Wind power plants

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
24 September 2019
Opportunity publication date
23 August 2019
Category
31121340
Value of contract
£5m-50m
Your guide to exporting
Report opportunity

Description

Part I: supply of integrated 4 (four) energy storage facilities each with a capacity of 1.5 MW and a capacity of 3 MWh together with inverters for 4 (four) synchronous wind power plants with a connection capacity of 2.5 MW each, with connection to the MV network and performance of all works necessary to start up energy storage facilities, configuration with wind power plants. Details. supply of 4 (four) energy storage facilities with a capacity of 3 MWh and a service life of not less than 10 (ten) years, for 8 000 (eight thousand) loading/unloading cycles with full DoD, for 4 (four) wind power plants with a capacity of 2.5 MW, b. connection to the SN,c. execution of all works necessary to start up the energy storage facilities, d. rated capacity of a single energy storage facility min. 3 max. 3.2 MWh.e. each energy storage facility should cooperate with a wind turbine for the consumption and supply of electricity, f. temperature range of the energy storage facilities: - 200C / + 400C,g. warehouse version - external container,h. inverter power - 1.5 MW, i. configuration of warehouses with wind power plants described in the ToR, j. other parameters of energy storage facilities - in accordance with the technical specification attached as Appendix No. 4 to the ToR. Generation, supply, installation, commissioning and servicing of 4 (four) synchronous wind power plants with a capacity of 2.5 MW each, including connection to the MV network, construction of foundations for wind power plants, soil strengthening. Power plant parameters: Synchronous turbines: number of ordered turbines: 4 Tower height: min. / max. 130 / 149 mTotal power plant height: min. / max. 195 / 206.5 Rotor diameter: min. / max. 115 m / 160 mNumber of rotor blades: 3 Rotor position: upwind, infinitely variable control from 0 degrees to 360 degreesRated turbine power: min. / max. 3.2 MW / 5 MWRated turbine power limit: the customer requires a turbine with the possibility of infinitely variable limitation of the rated power to 2.5 MWMaximum noise level: max. 105 dB(A) - at rated power of 2.5 MWFrequency: 50 HzOther: a. generation, supply, installation and commissioning of synchronous 4 (four) wind power plants with power of 2.5 MW,b. supply of components anchoring wind turbines along with the construction of foundations for each power plant, c. start-up and testing of wind power plants, d. connection of an internal lightning protection system within the tower, e. supply and connection of a monitoring system for wind power plants, f. supply and connection to a transformer switchboard, g. supply and installation of an internal mobile platform, h. supply and installation of a mobile platform. day and night marking according to Polish regulations and standards, and. system of synchronization of obstacle lighting operation for 4 (four) power plants, j. presentation to the ordering party of a set of certificates and attestations. Construction of infrastructure for 4 (four) wind power plants and 4 (four) energy storage facilities with the scope of works: construction of access roads, assembly (manoeuvring) yards, construction of MV cable lines with teletechnical sewerage, construction of fiber optic cable lines, power lines and teletransmission links.Other:a. construction of comprehensive infrastructure for 4 (four) wind power plants and 4 (four) energy storage facilities, b. construction of access roads, c. construction of assembly (manoeuvring) yards, d. construction of MV cable lines with teletechnical sewerage, e. construction of fiber optic cable lines, power lines and teletransmission links - in accordance with the ToR and its attachments.

Opportunity closing date
24 September 2019
Value of contract
£5m-50m

About the buyer

Address
Promet-Plast s.c. Elżbieta Jeżewska, Andrzej Jeżewski Gaj Oławski 21A Oława 55-200 Poland
Contact
prometplast.przetargi@gmail.com

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?