Germany - Well conversion SB 9 as a production well in the GWRA in Zwickau-Schedewitz

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
08 October 2024
Opportunity publication date
06 September 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Since 1998, the stationary groundwater purification plant (GWRA) in the area of the groundwater damage of the

former "August Bebel" coking plant has been in continuous operation.

The groundwater is purified by means of a "funnel and gate" "pump&treat" process using catalytic oxidation

and reinjection of the purified water into the remediation area using the basic principle of a purification cycle.
For this purpose, contaminated groundwater is lifted from 4 extraction wells at the angle of a steel sheet pile wall and

after purification in the groundwater purification plant, it is filtered back into 8 absorption wells in the inflow.
In 2021 and 2022, extensive investigations were carried out into the hydraulic adaptation of the groundwater remediation under

conducted by the GFI Groundwater Consulting Institute from Dresden.

As a conclusion and recommendation, absorption well 9 on the south wing of the sheet pile wall is to be converted into a production well.
To this end, the current extraction well 4 is to be decommissioned and the pump set and the existing control and instrumentation technology used for the new extraction well 5 (FB 5).

Opportunity closing date
08 October 2024
Value of contract
to be confirmed