Germany - train monitoring system
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 15 January 2020
- Opportunity publication date
- 06 November 2019
- Category
- 34943000: Train-monitoring system
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Project planning, supply and installation of an electronic interlocking system; renewal of the interlocking interior and exterior for the light rail line over the Bonn South Bridge from the B9 junction via the Robert-Schuman-Platz and Rheinaue stops to the Ramersdorf stop; the line runs alternately above and below ground.Parallel construction to the old system in operation (relay technology SpDrS-U), renewal of the cable system, signals, speed testing equipment, track clearance signal, step and door side selection control, train number recording, as well as connection of the point drives, operating and display system, train tracking and control (connection to existing system family VICOS OC100), interfaces to the neighbouring interlockings (interlocking Wurzer Str. and interlocking Ramersdorf-Restanlage SpDrS-U) Adaptation to an intermodal transport control system (ITCS) in operation as well as a management interface for decommissioning and functional dismantling of the old interior system and dismantling of the exterior system after commissioning of the new system.
- Opportunity closing date
- 15 January 2020
- Value of contract
- to be confirmed
About the buyer
- Address
- Elektrische Bahnen der Stadt Bonn und des Rhein-Sieg-Kreises GmbH, SSB Theaterstraße 24 Bonn 53111 Germany
- Contact
- thomas.schmoll@stadtwerke-bonn.de
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.