Germany - Stadtwerke Coesfeld GmbH (hereinafter referred to as Stadtwerke) currently operates a 10 kV medium-voltage grid, which is connected to the grid of the upstream grid operator via two transfer points.2-s...
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 11 November 2024
- Opportunity publication date
- 10 October 2024
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Stadtwerke Coesfeld GmbH (hereinafter referred to as Stadtwerke) currently operates a 10 kV medium-voltage grid, which is connected to the grid of the upstream grid operator via two transfer points.a 2-system 10 kV connection of a substation owned by Stadtwerke (SH Nord) is located in the north-east of the urban area. In the south of the urban area there is a 110 kV connection to a substation owned by the municipal utility (UA Kalksbeck). due to the expansion of renewable energy plants, the power reserve of both transfer points has been exhausted, making the addition of a further substation necessary. the Coesfeld municipal utility therefore intends to build a 110 kV/10 kV substation in the area of the Nord. Westfalen industrial park. The substation is to be connected to the existing 110 kV overhead line in the "UA Kalksbeck" substation, which is approx. 6.5 km away, via a 110 kV cable system owned by the municipal utility.
- Opportunity closing date
- 11 November 2024
- Value of contract
- to be confirmed
About the buyer
- Address
- Stadtwerke Coesfeld GmbH
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.