Canada - RFI 01-2025 Design-Build Services - Supply and Site Integration of four (4) 25kV Floating E-Houses

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
05 February 2025
Opportunity publication date
08 January 2025
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

This Request for Information is for the purposes of gathering information from the marine electrical, steel fabrication, and ship building industry to ascertain the interest and capability to design-build marine electrical and marine structural infrastructure (the “Services”) for the Island Class Terminal Electrification Program (the “Program”). The Program will introduce four (4) rapid-charging facilities on two inter-island routes (Route 19-Nanaimo Harbour-Gabriola Island & Route 23-Campbell River – Quathiaski Cove), allowing the new plug-in hybrid diesel-electric Island Class vessels, currently under construction, to operate in full electric mode. BC Ferries has identified the e-house solution to be an integrated power assembly within a steel pontoon designed for placement in salt water for the entire duration of its design life (“floating e-house”).Organizations interested in reviewing the bid package must download the RFI document, and choose the attachments listed under "RFx Documents".Note that it is the Proponent's responsibility to check BC Bid for additional posted documents e.g., addendum and Q&A documents that may be issued up until the closing date and time.Key datesPublished: January 8, 2025Closing Date: February 5, 2025Closing Time: 2:00 PM Pacific TimePre-Bid Meeting/Site Visit Meeting etc.: NONE

Opportunity closing date
05 February 2025
Value of contract
to be confirmed

About the buyer

Address
British Columbia Ferry Services Inc

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?