Description
The work is broken down into 18 lots. The work is divided into 18 lots, as follows:- in firm stages:-- Building 10: renovation of the day school (refurbishment of classrooms, archives and storage room, and overhaul of external joinery);-- Building 13: refurbishment of the ground floor (day school), various renovations, overhaul of external joinery and external insulation;-- Building 14: one-off work (sports hall, permanent contracts and administration);-- Building 15: Building 15: one-off measures (changing rooms, common rooms, weight-lifting room);- Building 17: complete renovation of the staff accommodation;- outside areas: creation of a reception hall, dressing room and bicycle shed, repair of the forecourt and sports ground, landscaping;- optional phase:- Building 15: renovation of the rooms located on the first floor.
- site clearance work;- dismantling work;- earthworks (approx. 2 700 m3);- sports marking work (approx. 1 450 ml);- construction work on rainwater pipes (approx. 240 ml);- work on water supply pipes (approx. 28 ml);- sewerage works (approx. 110 ml);- construction works for surface coverings (approx. 2,430 m2);- road surfacing works (approx. 421 m2);- surfacing works for footpaths (approx. 2,870 m2);- installation of road signs. Demolition of existing works:- removal of tiles including skirting boards (firm section: approx. 69 m2/optional section 1: approx. 7 m2);- removal of earthenware for walls or partitions (firm section: approx. 198 m2);- removal of flexible flooring including skirting boards and screed (firm section: approx. 198 m2): removal of flexible flooring including skirting boards (firm section: approx. 843 m2/optional section 1: approx. 224 m2);- removal of ceiling including framework (firm section: approx. 695 m2);- demolition of 5 to 10 cm thick walls. Demolition of building (firm section: approx. 168 m2) Demolition of building (firm section: boiler room, outside changing rooms in building 15, dressing room and bicycle room) Asbestos removal of:- baseboards (firm section: approx. 381 ml/optional section 1: approx. 70 ml);- earthenware (firm section: approx. 23 m2);- boiler (firm section);- pipes and ducts (firm section);- outside joinery with asbestos joint (firm section). - carrying out the installation of the site in TCE.- carrying out new structural works (foundations, networks, low floors, walls, posts, beams, slabs, raised ceilings, etc.) (firm section).- carrying out structural works in existing buildings (fire safety works, modification or sealing of bays, holes and hoppers, occasional demolitions, new networks under low slabs, rendering on fences, etc.) (firm section and optional section 1). - setting up scaffolding for its work;- carrying out metal framework work (approx. 27,865 kg);- carrying out cladding work (approx. 1,448 m2) and false ceilings (approx. 727 m2);- carrying out screen-printed glass sunbreakers (approx. 340 m2);- carrying out cladding for bay frames;- carrying out roofing (approx. 307 ml). - construction of self-protected waterproofing on concrete (approx. 504 m2);- construction of self-protected waterproofing on TAN (approx. 235 m2);- construction of rainwater drainage structures;- construction of a smoke extraction and roof access skylight;- construction of roof safety equipment. - installation of scaffolding for its work;- rendering on ITE (approx. 665 m2);- roofing (approx. 97 ml);- removal of external joinery (firm section);- external aluminium joinery with or without electric roller shutters (firm section);- overhaul of existing joinery and curtain wall (firm section/optional section 1);- stackable slatted sunbreakers (firm section): (firm section: approx. 22 m2);- revision of glass roof (firm section);- sun protection for glass roof (firm section: approx. 8 m2). - revision of guardrails (approx. 14 ml);- handrails (approx. 43 ml);- removal of metal doors;- exterior metal doors;- revision of metal curtain;- removal of fence (approx. 152 ml);- new barred fence (approx. 235 ml);- modification of existing fence (approx. 10 ml);- gate;- gates and wickets;- revision of gates and wickets;- double corridor turnstile;- crinoline ladder (approx. 17 ml);- exterior signage and totem. - Door removal (firm section/optional section 1);- kitchen removal (firm section);- solid core door block, CF, acoustic (firm section/optional section 1);- housing landing door (firm section);- door overhaul (firm section/optional section 1);- compact laminated partition (firm section: (firm section: approx. 63 m2);- post-formed washbasin top (firm section: approx. 11.50 ml);- kitchen furniture for staff accommodation (firm section);- opening frame in painted medium (firm section: (firm section: approx. 893 ml);- painted medium (firm section: approx. 2,262 ml);- cloakroom cupboard with bench (firm section);- triptych board (firm section/optional section 1);- worktop cabinet with document holder (firm section: approx. 5 ml);- door signs (firm section/optional section 1);- wooden floor with steps (firm section: approx. 11 m2);- chests, hatches. - ceiling removal (firm section: approx. 96 m2);- ceiling drainage (firm section: approx. 576 m2);- glass wool + plasterboard lining (firm section: approx. 19 m2);- plasterboard lining on frame (firm section: approx. 157 m2 /optional section 1: plasterboard ceilings on framework (firm section: approx. 654 m2/optional section 1: approx. 57 m2);- removable false ceiling 60 × 60 cm rock fibre (firm section: approx. 507 m2/optional section 1: approx. 293 m2);- revision of false ceiling (firm section: approx. 576 m2);- glass wool + plasterboard lining (firm section: approx. 157 m2/optional section 1: approx. 19 m2);- plasterboard lining on framework (firm section: approx. 157 m2/optional section 1: approx. 61 m2);- plasterboard ceilings on framework (firm section: approx. 654 m2/optional section 1: approx. 57 m2);- removable false ceiling 60 × 60 cm rock fibre (firm section: approx. 507 m2/optional section 1: approx. 293 m2);- revision of false ceiling (firm section: approx. 293 m2): (firm section: approx. 589 m2);- false ceiling with metal tray (firm section: approx. 283 m2);- false ceiling with metal slabs (firm section: approx. 313 m2);- wood fibre insulation panels under the floor (firm section: approx. 250 m2);- plasterboard partition on framework (firm section: approx. 250 m2);- plasterboard partition on frame (firm section: approx. 250 m2): approximately 200 m2/optional section 1: approximately 28 m2);- asbestos duct casing (firm section: approximately 25 m2);- CF 2h duct (firm section: approximately 13 m2);- plaster coating (firm section: approximately 226 m2/optional section 1: approximately 30 m2);- chests, hatches. - demolition of tiles (firm section: approx. 113 m2);- removal of earthenware (firm section: approx. 80 m2);- mortar screed (firm section: approx. 582 m2/optional section 1: approx. 6 m2);- waterproofing under external and internal tiles (firm section: approx. 107 m2);- porcelain stoneware floor tiles (firm section: approx. 107 m2);- plaster coating (firm section: approx. 226 m2/optional section 1: approx. 30 m2);- chests, trapdoors: (firm section: approx. 168 m2);- tiled steps and counter-steps (firm section: approx. 8 ml);- tiled skirting boards (firm section: approx. 16 ml);- floor drain (firm section);- SPEC waterproofing under tiles (firm section: approx. 395 m2);- stoneware wall tiles (firm section: approx. 444 m2);- bathtub apron. - laying of flexible flooring or parquet (firm section: 526 m2);- compact homogeneous PVC floor (firm section: 982 m2/optional section 1 : 228 m2);- U2SP3 PVC floor (firm section: 530 m2);- PVC sports floor (firm section: 322 m2);- PVC skirting boards (firm section: 322 m2);- PVC skirting boards (firm section: 322 m2): 1427 ml/optional section 1: 150 ml);- non-slip PVC flooring (firm section: 21 m2);- PVC wall protection (firm section: 434 m2/optional section 1: 80 m2);- PVC wall covering (firm section: 25 m2);- stair nosing (firm section: 47 ml);- podotactile marking. - painting on existing exterior metal (firm section: approx. 47 m2);- painting on existing fence (firm section: approx. 105 ml);- painting on existing exterior wood (firm section: approx. 60 m2);- painting on concrete facade (firm section: approx. 526 m2);- painting on existing plaster (firm section: approx. 526 m2);- painting on existing plaster (firm section: approx. 526 m2): painting on existing cladding (firm section: approx. 73 m2);- painting on internal wooden structures (firm section: approx. 115 m2/optional section 1: approx. 58 m2);- painting on internal metal structures (firm section: approx. 28 m2);- painting on existing internal wooden structures (firm section: approx. 28 m2);- painting on existing internal wooden structures (firm section: approx. 28 m2);- painting on existing external wooden structures (firm section: approx. 60 m2);- painting on existing concrete facade (firm section: approx. 526 m2);- painting on existing plaster (firm section: approx. 1 331 m2);- painting on existing cladding (firm section: approx. 73 m2);- painting on existing internal wooden structures (firm section: approx. 73 m2);- painting on existing internal wooden structures (firm section: approx. 73 m2);- painting on existing internal wooden structures (firm section: approx. 73 m2): approximately 1 192 m2/optional bay 1: approximately 64 m2);- painting on existing interior metalwork (firm section: approximately 43 m2);- painting on existing radiators (firm section: approximately 59 ml);- raking plaster (firm section: approximately 3 992 m2/optional bay 1: approximately 451 m2);- preparation for painting on asbestos support (firm section: approximately 443 m2);- painting on ceilings (firm section: approximately 895 m2/optional section 1: approximately 102 m2);- painting on walls (firm section: approximately 4,437 m2/optional section 1: approximately 453 m2);- cleaning. Firm section:- building 10: fire safety compliance, servo-control of fire doors, implementation of automatic detection in the basement premises, additional sound and light diffusers. Installation of photovoltaic panels for self-consumption of the electricity produced;- Building 11: installation of lighting and emergency lighting equipment required for the various types of premises in accordance with the programme recommendations; modification/extension of VDI sub-distributors, cabling and terminal sockets in accordance with the programme;- Building 13: fire safety compliance, control of fire dampers. Implementation of lighting and emergency lighting equipment required for the various types of premises. Installation of electrical power supplies for electric roller shutters. Modification/extension of VDI sub-distributors, cabling and terminal sockets according to the programme;- Building 14: installation of electrical power supplies for electric adjustable sunbreakers. Power supply for the thermal comfort equipment for the CDI; - Power supply for the PMR lift. Implementation of lighting and emergency lighting equipment necessary for the different types of premises. Modification/extension of the VDI sub-distributors, cabling and terminal sockets; - Building 15 (ground floor): fire safety compliance, control of fire dampers. Power supply to the ventilation system. Installation of lighting equipment, emergency lighting, power sockets and motive power necessary for the various types of premises. Modification/extension of the VDI sub-distributors, cabling and terminal sockets;- Building 16: relocation of the existing fire installations to the new lodge. Extension and adaptation of the existing fire safety system. Relocation of the safety installations to the general distribution room of the establishment. Extension and adaptation of the existing anti-intrusion system. Adaptation of the access control system of the existing site. Extension and adaptation of the existing video surveillance system. Implementation of lighting equipment, security lighting, power sockets and motive power necessary for the different types of premises. Housing. Complete electrical upgrading of the functional housing with new distribution under trunking, optional section 1:- building 15 (R+1): installation of lighting equipment, emergency lighting, electrical outlets and motive power necessary for the different types of premises. Modification/extension of VDI sub-distributors, cabling and terminal sockets. Firm section:- building 13: partial replacement of convector heaters of the finned tube type with panel radiators. Ventilation by compact two-room dual-flow units. Partial replacement of sanitary appliances on the ground floor. Complete overhaul of the student sanitary facilities on the ground and second floors;- building 14 (ground floor): air conditioning by mini DRV. Building 15 (ground floor): creation of changing rooms and extension of the weight room, with replacement of convector heaters of the finned tube type with panel radiators, extension of double-flow ventilation and installation of sanitary appliances;- Building 16: heating/cooling by individual direct expansion system, ventilation and sanitary appliances for the dressing room;- Building 17: replacement of individual boilers and sanitary appliances, with implementation of individual single-flow ventilation for the staff accommodation.Optional stage 1:- Building 15 (ground floor+1): partial replacement of convectors such as finned tube heating with panel radiators and implementation of double-flow central ventilation. - construction and maintenance of green areas:-- planting of trees;- planting of shrub beds (approx. 296 m2);- planting of hedges (approx. 14 ml);- supply and fitting of wooden steel benches/seats;- supply and fitting of concrete benches;- supply and fitting of baskets;- supply and fitting of picnic tables;- supply and fitting of table tennis tables;- supply and laying of vegetable pots;- supply and laying of grassed joint paving stones (approx. 286 m2);- supply and laying of mortar joint paving stones (approx. 11 m2);- supply and laying of thin steel borders (approx. 155 ml);- creation of lawns (approx. 3,700 m2);- creation of a drip watering network for flower beds and trees. Supply of cardboard boxes, adhesives and labels necessary for packing by users. Handling, dismantling and reassembly of the furniture. Packing. Removals and accommodation in the temporary premises:- firm section: functional accommodation (six accommodation units);- firm section: gym;- optional section 1: EDPI rooms and annexes (three rooms and two annexes). Vertical lift PMR to cross the staircase of about 68 cm height and removal of the existing stairlift.
- Opportunity closing date
- 22 September 2020
- Value of contract
- £1m-5m
About the buyer
- Address
- SPL Midi-Pyrénées Construction Mandataire agissant au nom et pour le compte de la région Occitanie, représentée par la présidente de la région Occitanie Pyrénées-Méditerranée, Mme Carole Delga, 11 avenue Parmentier, Central Parc 2, 4e étage, BP 22414 Toulouse Cedex 31086 France
- Contact
- marion.guichard@arac-occitanie.fr
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.