Poland - Repair and maintenance services of railway rolling stock
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 19 November 2019
- Opportunity publication date
- 01 November 2019
- Category
- 50222000
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Repair of 24 pieces of locomotive wheelsets EU07.1. The scope of repair of P4 subassembly is a set of activities necessary to obtain technical condition and technical parameters specified in the regulations and conditions of technical acceptance for a given subassembly type. The scope covers the performance of: 1) activities resulting from instructions Bt-3, DSU and DT (permanent scope of repair); 2) works beyond the permanent scope of repair P4, specified in Appendix No. 2 to the templates of agreements constituting Annexes 3.1. to the ToR.2.The Contractor guarantees that one (1) component will be repaired within no more than: - for part 1 of the subject matter of the order: up to 20 working days.3. The Contractor shall provide a guarantee and warranty for each component for no less than 24 months from the date of acceptance after the repair, i.e. the date of signing the acceptance protocol by the acceptance commissioner without reservations.The details are specified in the ToR. Repair of 56 pieces of locomotive wheelsets EP07.1. The scope of repair of P4 subassembly is a set of activities necessary to obtain technical condition and technical parameters specified in the regulations and conditions of technical acceptance for a given subassembly type. This scope covers the performance of: 1) activities resulting from instructions Bt-3, DSU and DT (Permanent scope of repair); 2) works beyond the permanent scope of repair P4, specified in Annex No. 2 to the templates of agreements constituting Annexes 3.2. to the ToR.2.The Contractor guarantees that one (1) component will be repaired within no more than:- for part 2 of the subject matter of the order: up to 20 working days.3. The Contractor shall provide a guarantee and warranty for each component for no less than 24 months from the date of acceptance after the repair, i.e. the date of signing the acceptance protocol by the acceptance commissioner without reservations.The details are specified in the ToR.
- Opportunity closing date
- 19 November 2019
- Value of contract
- to be confirmed
About the buyer
- Address
- „PKP Intercity” S.A. Al.Jerozolimskie 142A Warszawa 02-305 Poland
- Contact
- michal.pilich@intercity.pl
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.