The following activities are to be carried out at the House of World Cultures (HKW) from May/June 2019. The work is to be carried out parallel to other trades within the framework of partial repair III of the HKW. New construction of acoustically effective wall and ceiling claddings, with slotted or perforated acoustic panels, 365 m installation of partition walls New construction of plasterboard walls and facing shells, various thicknesses, double planking, height approx. 3 m, 133 m fire protection work New construction of a F90 GK suspended ceiling, 30 m fire protection technical upgrading of a masonry wall by planking with fire protection panels, 62 m opening and closing of a fire protection wall for grid installation incl. Promat cladding, 20 m installation of suspended ceilings New construction of a suspended wire plaster ceiling (Rabitz ceiling), gypsum lime plaster on plaster base Expanded metal with 30 mm mortar thickness, double curved, surface smooth, 1,330 m , incl. incorporation of special components (luminaires and spotlights, 126 pcs.) and length-oriented connections and joints for integration of ventilation, 170 running metres of new construction of an acoustically effective drywall suspended ceiling, jointless, smooth surface, installation height up to 5.75 m, 740 m of new construction of a plasterboard suspended ceiling, jointless, smooth surface, installation height up to 2.50 m, 100 m Making of partial ceiling openings (100 x 100) in existing Rabitz ceiling, later closing of these openings, 10 pieces Making of inspection flap 35x35 cm in existing GK suspended ceiling, 1 piece demolition work demolition + disposal of the existing hanging wire plaster ceiling, (Rabitz ceiling), gypsum lime plaster on plaster base expanded metal with approx. 30mm mortar thickness, double curved, surface smooth, incl. special components (lights and spotlights, 126 pcs.) 1.330 m demolition and disposal of contaminated wall and ceiling claddings (KMF contaminated, exposure class 3), 180 m demolition and disposal of an F90 GK suspended ceiling, 30 m locksmith work metal construction work steel staircase as machine staircase, three flights, stair stringers made of steel C-profiles according to static requirements 25 running metres, 23 grating steps 0.70 x 0.24 m, grating levels steel 12.7 m, steel railing with handrail and knee rail 20 running metres incl. Statically required steel girders and substructure, all hot-dip galvanised, 1 piece of steel staircase as machine staircase, single run, stair stringers of steel C-profiles according to static requirements following the curved wall 9 running metres, 14 grating steps 0.70 x 0.24 m, steel railing with handrail and knee rail 5 running metres incl. statically required hangers and substructure, lacquered or hot-dip galvanized, 1 piece steel staircase as machine staircase, single-run, suspended from ceiling, stair stringers made of steel C-profiles according to static requirements 5 running metres, 8 grating steps 0.70 x 0.24 m, steel railing with handrail and knee rail 5 running min kl. Statically required hangers and substructure, all hot-dip galvanised, 2 ladders, hot-dip galvanised steel, 10 rungs, WxH 0.50 x 2.60 m grating level on existing steel substructure, grating press, aluminium, mesh 40x40, supporting bars 60/3, radial cuts to measure, incl. Penetrations, 55 m steel grating bars incl. steel UK according to static requirements, entire construction suspended from ceiling, grating Press steel hot-dip galvanised, mesh 30x60, bearing bars 25/2, w= 60 cm, 279 linear metres steel grating bars incl. steel UK, mesh 30x60, bearing bars 25/2, w= 60 cm, 279 linear metres steel grating bars incl. steel UK according to static requirements, entire construction suspended from ceiling, steel UK according to static requirements, steel UK according to static requirements, mesh 30x60, mesh 25/2, mesh 279, mesh 30x60, mesh 25x60, mesh 25x60, mesh 279, mesh 25x60, mesh 25x60, mesh 279 Steel UK according to static requirements, entire construction is suspended from ceiling, grating Press steel hot-dip galvanized, mesh 30x60, bearing bars 25/2, w= 87.5 cm, 100 running metres Production of new suspension points for the webs, bore depth approx. 17 cm, d= approx.15mm, dowel and threaded rod, 83 pieces Production of a punctiform steel substructure for stage technology installations, 87 pieces Demolition work Demolition and disposal of the old bridges, consisting of wooden planks, steel profiles and hangers, 180 running metres
- Opportunity closing date
- 21 January 2019
- Value of contract
- £100k-1m
About the buyer
- Address
- Kulturveranstaltungen des Bundes in Berlin GmbH Schöneberger Straße 15 Berlin 10963 Germany
- Contact
- ausschreibungen@kbb.eu
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.