United States - Nobles Branch Sump Improvements Design-Bid-Build
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 15 November 2024
- Opportunity publication date
- 01 October 2024
- Value of contract
- to be confirmed
- Your guide to exporting
Description
The Nobles Branch Sump Improvement project includes the installation of four 60-inch reinforced concrete pipes below Empire Central Drive, Dallas, Texas via the jack and bore method. Additionally, it consists of installation of four (4) proposed slide gates, plugging and abandoning an existing 60 inch RCP culvert, relocation of an existing 48 inch Storm sewer, demolishing of existing upstream headwall, installation of inlet and outlets structures, excavation of embankment section, slope protection, channel protection, installation of mechanical and electrical equipment, and roadway pavement repair.
- Opportunity closing date
- 15 November 2024
- Value of contract
- to be confirmed
About the buyer
- Address
- W076 ENDIST FT WORTH
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.