France - Metal frames
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 01 April 2019
- Opportunity publication date
- 22 February 2019
- Category
- 45223210, , ,
- Value of contract
- to be confirmed
- Your guide to exporting
Description
The Grande Halle Voyageurs (GHV) of the Gare de Paris Saint-Lazare (PSL) includes 12 halls (+ the Halle transversale) covering 27 lanes and 15 platforms: the highest ridge height is 23 m (Hall 1) and the lowest 10 m (Hall 4B).Hall widths: between 8 and 54 mHalls 1: coverage of tracks 1 to 8 and platforms 1, 2/3, 4/5, 6/7 and 8/9Width 52 m and length from 97 to 112 m, Description of work on lot 1: Scaffolding and temporary installations:- secondary scaffolding 7,549 m2,- umbrella 7,549 m2,- asbestos removal work: - abrasive pickling 22,162 m2,- removal and management of the lath placed in a specialised waste collection centre 5,047 m2.Removal work:- zinc roof removal 4,915.9 m2,- glass roof removal - reinforced glass 1,645.9 m2,- metal frame removal 834 m2,Frame/roofing:- zinc roof 4,915.9 m2,- replacement of frame elements (complete elements) 44,700 kg- supply and installation of new elements 21907 kg- reinforcement of frame elements 262.64 ml Glassware/metalwork:- rainwater drainage 396 ml,- glazing for single-slope canopy 1,504.72 m2,- glazing for double-slope canopy 2,039.33 m2,- walkway (transverse/horizontal collective/individual) 1,447 ml,- ladder bar system 1,892 ml,- window curtain 829 m2.Lighting/sound metalwork:- hanging from the steel structure (cables) 355.2 ml,- hanging from the steel structure 64 units,- brackets and system for hanging luminaires on sandpit or long-pit 17 units,- interior stabilizer cables 632 ml,- luminaire frame 256 units.Panelling:- panelling under the roof 4915.9 m2,- painting on panelling 5,899.08 m2.Painting:- anti-corrosion treatment and finishing of the remaining structure 17,466 m2,- anti-corrosion treatment and finishing of the new structure 5,273 m2. The Grande Halle Voyageurs (GHV) of the Gare de Paris Saint-Lazare (PSL) includes 12 halls (+ the Halle transversale) covering 27 lanes and 15 platforms: the highest ridge height is 23 m (Hall 1) and the lowest 10 m (Hall 4B).Hall widths: between 8 and 54 m- Hall 4: coverage of tracks 17 to 23 and platforms 16/17, 18/19, 20/21, 22/23 and 23/24Width 48 m and length 138 to 162 m,- Hall 5: coverage of tracks 24 to 27 and platforms 23/24, 25/26 and 27Width 27 to 33 m and length 162 to 173 m- + Hall 5SDesignation of works in batch 2:Scaffolding and temporary installations: - secondary scaffolding 12,268 m2,- umbrella 12,268 m2,- asbestos removal work,- abrasive pickling 24,536 m2,- removal and management of the lath placed in a specialised waste collection centre 7,354 m2.Removal work:- zinc roofing 8,253.48 m2,- glass roofing - reinforced glass 2963.71 m2,- metal framework 2,766 m2.Frame/roofing: - zinc roofing 8,253.48 m2,- replacement of structural elements (complete elements) 30,670 kg,- supply and installation of new elements 34,810 kg,- reinforcement of structural elements 75 ml.Glassware/metallery:- rainwater drainage 1,426 ml,- glazing for single-slope glass 2,121.14 m2,- glazing for double-slope glass 2,516.81 m2,- walkway (transverse/horizontal collective/individual) 1,687 ml,- ladder bar system 3,124 ml,- glass curtain 2,117 m2.Lighting/sound metalwork:- hanging from the steel structure (cables) 481.1 ml,- hanging from the steel structure 196 units,- brackets and system for hanging luminaires on sandpit or long-panel purlins 98 units,- interior stabilizer cables 1,669.6 ml,- luminaire frame 1,372 units.Panelling:- panelling under the roof 8,253.48 m2,- painting on panelling 9,904.18 m2.Painting:- anti-corrosion treatment and finishing of the remaining structure 12,780 m2,- anti-corrosion treatment and finishing of the new structure 5,559 m2. The Grande Halle Voyageurs (GHV) of the Gare de Paris Saint-Lazare (PSL) includes 12 halls (+ the Halle transversale) covering 27 lanes and 15 platforms: the highest ridge height is 23 m (Hall 1) and the lowest 10 m (Hall 4B).Hall widths: between 8 and 54 m - Hall 1: coverage of tracks 1 to 8 and platforms 1, 2/3, 4/5, 6/7 and 8/9. 52 m wide and 97 to 112 m long,
- Opportunity closing date
- 01 April 2019
- Value of contract
- to be confirmed
About the buyer
- Address
- SNCF Réseau 449 avenue Willy Brandt Euralille 59777 France
- Contact
- steve.lorand@reseau.sncf.fr
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.