France - Lifting and handling equipment and spare parts
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 02 August 2019
- Opportunity publication date
- 03 May 2019
- Category
- 42400000: Works trucks, self-propelled, (not fitted with lifting or handling equipment), for factories, warehouses etc, for short distance transport of goods, tractors used on railway station platforms; parts thereof
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Firm services: the firm services covered by this contract allow the following main improvements to be made: - all the partitions and doors of premises 502/504/505/505/506/506/510/511/512/512/513/519/520,- the interior layout of control room 517,- the filling of penetrations in room 517,- transfer equipment: fixed handling equipment, mobile handling equipment (including associated loading stations),- return chamber 503,- conditioning chamber 507/508/509,- water, compressed air and breathing air networks and pipelines,- distribution, the argon extinguishing network of pit 0 and the associated control command,- the Sphinx,- the mechanical assembly constituting the dexter arm and its mast and sliding hatch and the associated control command,- the dexter arm/mast / sliding hatch assembly and the associated control command,- pit intervention tools,- maintenance tools,- LV distribution and mechanical process control,- nuclear ventilation with LV distribution and associated control command (including Sphinx),- process nuclear control (PNC),- the video surveillance system and process,- the layout of the 517 control room,- the shuttle containers,- the internal fittings for pre-concrete drums,- the fire-fighting equipment,- the characterisation station,- the storage box for calibration sources,- the extinguishers.Options: for mechanics:- option 1: adaptation of the control system of the master arm type robot arm without force feedback,- option 2: adaptation of the control system of the master arm type robot arm with force feedback,- option 3: adaptation of a 2nd clamp at the end of the arms (opposite clamps),- option 4: Concealed pit sorting operation (recovery bucket),- option 10: removal of the local operating element 133,- option 11: removal of the local engine 155,- option 12: removal of the local fan 155,- option 13: removal of the bridge from room 155,- option 14: modification of the injection system and the BI cover to add 2 injection points.For nuclear control process:- option 5: supply of a 2nd germanium detector,- option 6: supply of a 2nd STTC probe,- option 7: study, supply, testing and assembly of a CZT probe instead of the STTC probe in a pit,- option 9: study and implementation of the software for the characterization station.For nuclear ventilation: - option 8: study and implementation of the installation of the CTA module outside the controlled area; - option 15: additional cost for work in the premises 155-515-516 in the case of classification in the controlled area; additional services: implementation of services on the unit price list according to a list defined in the specifications.
- Opportunity closing date
- 02 August 2019
- Value of contract
- to be confirmed
About the buyer
- Address
- CEA Marcoule Service commercial, bureau achats projets — bâtiment 181, BP 17171 Bagnols-sur-Cèze Cedex 30207 France
- Contact
- marion.dethan@cea.fr
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.