Description

The objective of this project is to stabilize the north side slope of Roach Road located at the Lake Apopka North Shore, using a geosynthetic stabilization product. It is the responsibility of the Contractor to properly size the geosynthetic material for this project; however, a 12-foot panel was used previously.