Turkey - Drinking-water treatment plant construction work
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 25 May 2022
- Opportunity publication date
- 28 March 2022
- Category
- 45252126: Dr
- Value of contract
- to be confirmed
- Your guide to exporting
Description
These contracts will include: Transmission Lines and expected to be implemented from May 2022 to November 2023
Construction of drinking water supply transmission lines length of 24,1 km of HDPE PN10 pipes and 43,4 km length of steel pipes, one pumping station, and new water concrete collection tank with 50 m3 capacity, branch structure, 3 pressure reducing chambers and contructing outlet structure, outlet pipeline of approx. 41 m length of HDPE PN10 pipes, construction of 2 water reservoirs with capacity of 4000 m3 each, renovating 5 existing storage tanks in total volume approx. 21.000 m3 and construction of auxiliary structures (valve chambers, maneuver chambers, flowmeter chambers, etc.)
- Opportunity closing date
- 25 May 2022
- Value of contract
- to be confirmed
About the buyer
- Address
- Yalova Municipality Süleymanbey Mahallesi Cumhuriyet Caddesi Karizma İş Merkezi No:3 Kat:4 PK: 77100 YALOVA Yalova 77100 Turkey
- Contact
- gurkan.kacar@yalova.bel.tr
The deadline to apply for this opportunity has passed.
Visit the