Chile - Design, supply and installation OF a flood irrigation system for the urban trees located in ricardo Lyon

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
14 November 2024
Opportunity publication date
22 October 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

The Municipality of Providencia requires to contract the works for the "DESIGN, SUPPLY AND INSTALLATION OF A FLOODING SYSTEM FOR THE URBAN TREES ON RICARDO LYON", currently, the trees present on both sidewalks of Ricardo Lyon between the sections of Av. Nueva Providencia and Francisco Bilbao, is irrigated by means of the existing irrigation ditch system or by water trucks. The objective of the contract is to replace the current irrigation system with one that is more adequate to the water needs of the trees.

The contractor must design and install an automatic irrigation system that distributes water through the current irrigation ditch system, channeled through PPR pipes, and that delivers water to each tree in a localized and focused manner by means of floods. The irrigation system supply and installation works must be executed within a maximum period of 120 calendar days, counted from the signing of the Land Delivery Act, once the irrigation system installation is completed, the contractor must also consider the maintenance and guarantee of the irrigation system for a period of 90 calendar days.

Opportunity closing date
14 November 2024
Value of contract
to be confirmed

About the buyer

Address
I MUNICIPALIDAD DE PROVIDENCIA, Dirección de Secpla

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?