Rwanda - Dam construction work
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 15 February 2021
- Opportunity publication date
- 11 December 2020
- Category
- 45247210: Da
- Value of contract
- more than £50m
- Your guide to exporting
Description
The engineering, procurement, construction, testing and commissioning of the Ruzizi III regional hydropower project.
The RIII-EPC contract will include the engineering, procurement, construction, testing and commissioning of a 45 m height embankment dam with associated spillway, low level outlet, and eco-flow powerhouse, a 3.8 km long, 6 to 7 m diameter, concrete-lined headrace tunnel from the dam reservoir to the powerhouse, penstock and unit penstocks, power station and switchyard, a 8.3 km long 220 KV double-circuit transmission line connecting the Ruzizi III substation to the regional dispatch station in Kamanyola (DRC), access roads from Bugarama (Rwanda) and Kamanyola (DRC) to the dam site, and all ancillary and related works. The power station will have three or four generating units giving an installed capacity of 150 to 200 MW, depending on ongoing design finalisation.
- Opportunity closing date
- 15 February 2021
- Value of contract
- more than £50m
About the buyer
- Address
- Ruzizi III Energy Ltd Sanlam Towers, 4th Fl., Wing A, KN 67 St Kigali 3300 Rwanda
- Contact
- peter.rae@ruzizienergy.com
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.