Germany - Construction work for pipelines, telecommunications and power lines, for highways, roads, airfields and railroads; leveling work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
24 November 2023
Opportunity publication date
28 October 2023
Category
45230000
Value of contract
£5m-50m
Your guide to exporting
Report opportunity

Description

The customer plans to set up an NGA network (FTTB) on part of the territory of the Buchenbach and Löffingen municipalities. The aim is to eliminate the white spots that still exist there.
The customer plans to build an NGA network (FTTB) in part of the Buchenbach municipality. The aim is to eliminate the white spots that still exist there. The project is to be funded in accordance with the Directive on Support for Broadband Expansion in the Federal Republic of Germany (Richtlinie zur Unterstützung des Breitbandausbaus in der Bundesrepublik Deutschland) and the Administrative Regulation of the Ministry of the Interior on the Cofinancing of Funding from the Directive on Support for Broadband Expansion in the Federal Republic of Germany (VwV Breitbandmitfinanzierung) and VWV Breitbandförderung. The provisional notice of funding dated 29.03.2021for the project is attached as an annex to the provisional notice of funding dated 29.03.2021. Overall, investments totaling around EUR 12,723,016.95 net are planned for the expansion of the NGA network (FTTB).The explanations and specifications of the funding and project executing agency regarding the material concept must be observed. Buchenbach planning statusThe route lengths listed may be reduced or postponed as a result of the joint relocations that have been coordinated in the meantime. Local networkFederal funding for broadband e-File reference: 832.5/3-20 09BW200617The current planning status corresponds to a draft plan based on the existing structural planning. A total of approx. 378 FTTB house connections are planned. The project comprises:- New route construction (paved surface): 50,166 m- New route construction (unpaved surface): 11,33 m- Cable feed into existing empty conduits: 9,404 m- FTTB distributors (cabinets and/or manholes): 44 pieces- POP prefabricated buildings and/or cabinets: 3 pieces Furthermore, eligible tunnelling is planned on the basis of reserve capacities. The planning status will be communicated accordingly with the invitation to bid in the next step of the procedure. Full reference is made to the annex Terms of Reference to the tender documents. The customer plans to set up an NGA network (FTTB) in part of the municipality of Löffingen. The aim is to eliminate the white spots that still exist there. The services to be performed for the local network are limited to the districts of Göschweiler and Bachheim.The project is to be funded in accordance with the directive "Funding to support broadband expansion in the Federal Republic of Germany" and the administrative regulation of the Ministry of the Interior for co-funding from the directive to support broadband expansion in the Federal Republic of Germany (VwV Breitbandmitfinanzierung) and VWV Breitbandförderung. The provisional notice of funding dated 22.03.2021for the project is attached as an annex to the provisional notice of funding dated 22.03.2021. Overall, investments totaling around EUR 8,325,220.24 net are planned for the expansion of the NGA network (FTTB). The information and specifications of the funding and project executing agencies regarding the material concept must be observed. Löffingen planning statusThe route lengths listed may be reduced or postponed as a result of the relocations that have been coordinated in the meantime. BackboneLand broadband funding file number 7-8433.3/4094- New route construction (paved surface): 19,000 m Local networkFederal broadband funding e file number: 823.5/3-20 09BW200637The current planning status corresponds to a draft plan based on existing structural planning. A total of approx. 379 FTTB house connections are planned. The project comprises:- New route construction (paved surface): 17,968 m- New route construction (unpaved surface): 1,701 m- Cable feed into existing empty conduits: 1,194 m- FTTB distributors (cabinets and/or manholes): 22 units- POP prefabricated buildings and/or cabinets: 2 units Furthermore, eligible tunnelling is planned on the basis of reserve capacities. The planning status will be communicated accordingly with the invitation to bid in the next step of the procedure. Full reference is made to the annex Terms of Reference to the tender documents.

Opportunity closing date
24 November 2023
Value of contract
£5m-50m

About the buyer

Address
Zweckverband Breitband Breisgau-Hochschwarzwald Stadtstraße 2 Freiburg im Breisgau 79104 Germany
Contact
vergabe@iuscomm.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?