Poland - Construction work for district heating networks
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 25 March 2019
- Opportunity publication date
- 14 February 2019
- Category
- 45232140, , , , , ,
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Execution of construction works for the construction of a heat network made of pre-insulated steel pipes along Druskienicka Street in Poznań1. Execution of construction works in the scope of building a heat network in pre-insulated technology with a resistance alarm installation with diameters of 2xDN 250 and a length of approx. 436.5 from the chamber (P7/2)(B4) to the chamber (P7/2)(B22) together with connection to the existing connections DN40-65 m according to the design documentation2. Liquidation of the heating chamber - (P7/2)(B21).Reconstruction of heat networks in pre-insulated technology should be carried out in accordance with the building and execution design and other arrangements:- Purchase of pre-insulated materials and other additional materials in accordance with the ToR - Replacement of surfaces and green areas in accordance with the reconstruction project or agreements with the owner/manager of the area - Traffic organisation for the construction period in accordance with the traffic organisation project or agreements with the owner/manager of the area together with payment of the necessary fees - Protection of electricity and water intake for the needs of the construction - Geodetic service - Performing tests, commissioning and acceptance - Disassembly works indicated by the investor or owner/manager of the area - Additional works not included in the project but indicated by the investor or owner/manager of the area - Assembly of high performance pipelines from the connection to the junction's threshold valves - Execution of the required tests related to the technology Execution of construction of a pre-insulated heating network with connections as part of the modernization of the existing heating network at the Bohaterów II World War 2-31 housing estate in Poznań:1. Execution of construction works for the construction of a preinsulated district heating network connection with a resistance alarm system with diameters of 2xDN 32-125 and length of approx. 683 m, in accordance with the design documentation2. Liquidation of the district heating chamber - (Z1/179)(C5/7)Detailed description of the subject of the contract includes: 1. Design documentation consisting of a construction and executive design2. Technical specification of execution and acceptance of construction works included in Part III of the ToR. Reconstruction of heat networks in pre-insulated technology should be performed in accordance with the construction and executive design, and other arrangements:- Purchase of pre-insulated materials and other additional materials in accordance with the ToR - Replacement of surfaces and green areas in accordance with the reconstruction design or arrangements with the owner/manager of the area.- Traffic organisation for the construction period in accordance with the traffic organisation design or agreements with the owner/manager of the area, together with payment of the necessary fees.- Securing electricity and water intake for the purposes of construction.- Surveying - Testing, commissioning and acceptance.- Disassembly works indicated by the investor or the owner/manager of the area.- Other works not included in the project but indicated by the investor or the owner/manager of the area. Execution of construction works for the construction of a preinsulated district heating network with connections as part of the modernization of the existing district heating network at the Bohaterów II World War 34-70 housing estate in Poznań1. Execution of construction works for the construction of heat distribution network connections in pre-insulated technology with a resistance alarm system with diameters of 2xDN 50-125 and length of approx. 618 m in accordance with the design documentation2. Liquidation of the heat distribution chamber - (J3/6)(6/1); (J3/6)(6/2).Reconstruction of heat networks in pre-insulated technology should be carried out in accordance with the building and execution design and other arrangements:- Purchase of pre-insulated materials and other additional materials in accordance with the ToR - Replacement of surfaces and green areas in accordance with the reconstruction project or agreements with the owner/manager of the area - Traffic organisation for the construction period in accordance with the traffic organisation project or agreements with the owner/manager of the area together with payment of the necessary fees - Protection of electricity and water intake for the needs of the construction - Geodetic service - Performing tests, commissioning and acceptance - Disassembly works indicated by the investor or owner/manager of the area - Additional works not included in the project but indicated by the investor or owner/manager of the area - Installation of high performance pipelines from the connection to the threshold valves of the interchange - Execution of the required tests related to the technology Execution of construction of a pre-insulated district heating network with connections to the buildings at ul. Jeżycka 48, Norwida 14,17,17,19 in Poznań1. Execution of construction works for reconstruction and construction of heat network connections in pre-insulated technology with a resistance alarm system with diameters of 2xDN 65-125 and length of approx. 429 m, in accordance with the design documentation2. Liquidation of heat chambers - (J3/6)(6/1); (J3/6)(6/2); (J3/6)(6/3); (J3/6)(6/4); (J3/6)(6/4); (J3/6)(6/4).Reconstruction of heat networks in pre-insulated technology should be carried out in accordance with the building and execution design and other arrangements:- Purchase of pre-insulated materials and other additional materials in accordance with the ToR - Replacement of surfaces and green areas in accordance with the reconstruction project or agreements with the owner/manager of the area - Traffic organisation for the construction period in accordance with the traffic organisation project or agreements with the owner/manager of the area together with payment of the necessary fees - Protection of electricity and water intake for the needs of the construction - Geodetic service - Performing tests, commissioning and acceptance - Disassembly works indicated by the investor or owner/manager of the area - Additional works not included in the project but indicated by the investor or owner/manager of the area - Installation of high performance pipelines from the connection to the threshold valves of the interchange - Execution of the required tests related to the technology Execution of construction of a pre-insulated heating network with connections to buildings at ul. Poznańska 14-15 in Koziegłowy1. Constructing and constructing heat network connections in pre-insulated technology with a resistance alarm system with diameters of 2xDN 40-200 and a length of approx. 470 m, in accordance with the design documentation2. Liquidation of heat chambers - (A4/1)(K1); (A4/1)(K2); (A4/1)(K8).Reconstruction of heat networks in pre-insulated technology should be carried out in accordance with the building and execution design and other arrangements:- Purchase of pre-insulated materials and other additional materials in accordance with the ToR - Replacement of surfaces and green areas in accordance with the reconstruction project or agreements with the owner/manager of the area - Traffic organisation for the construction period in accordance with the traffic organisation project or agreements with the owner/manager of the area together with payment of the necessary fees - Protection of electricity and water intake for the needs of the construction - Geodetic service - Performing tests, commissioning and acceptance - Disassembly works indicated by the investor or owner/manager of the area - Additional works not included in the project but indicated by the investor or owner/manager of the area - Installation of high performance pipelines from the connection to the threshold valves of the interchange - Execution of the required tests related to the technology Execution of construction of a pre-insulated heating network with connections to buildings at ul. Leonarda 6/Winiary 54 in Poznań1. Execution of construction works in the scope of reconstruction and construction of heating network connections in pre-insulated technology with resistance alarm installation with diameters of 2xDN 50-200 and length of approx. 90 m according to the design documentationThe reconstruction of thermal networks in pre-insulated technology should be carried out in accordance with the building and execution design and other arrangements:- Purchase of pre-insulated materials and other additional materials in accordance with the ToR - Replacement of surfaces and green areas in accordance with the reconstruction project or agreements with the owner/manager of the area - Traffic organisation for the construction period in accordance with the traffic organisation project or agreements with the owner/manager of the area together with payment of the necessary fees - Protection of electricity and water intake for the needs of the construction - Geodetic service - Performing tests, commissioning and acceptance - Disassembly works indicated by the investor or owner/manager of the area - Additional works not included in the project but indicated by the investor or owner/manager of the area - Installation of high-performance pipelines from the connection to the junction's threshold valves - Performing the required tests related to the technology.
- Opportunity closing date
- 25 March 2019
- Value of contract
- to be confirmed
About the buyer
- Address
- Veolia Energia Poznań S.A. Energetyczna 3 Poznań 61-016 Poland
- Contact
- boguslawa.piatkowska@veolia.com
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.