Switzerland - Construction work
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 14 January 2021
- Opportunity publication date
- 09 December 2020
- Category
- 45000000: Co
- Value of contract
- to be confirmed
- Your guide to exporting
Description
To enable PSI to adequately fulfil its legal mandate, a further interim storage facility must be realised. This new storage building is to be planned and constructed under the project title PSI Stacking Area OST OSPA and with the PSI building designation ORAB. The building to be constructed should relieve the Federal Interim Storage Facility BZL by taking up existing and future small concrete containers and satisfy the relevant current legal requirements with regard to licensing, construction and operation. The building consists of two parts:- a water-impermeable floor trough made of reinforced concrete with external sealing,- a hall structure made of structural steel sections which is clad with lightweight construction elements as a facade. The roof will be constructed with a classical structure of trapezoidal sheet metal, vapour barrier, thermal insulation and slated bitumen sheeting as a top layer.
- Opportunity closing date
- 14 January 2021
- Value of contract
- to be confirmed
About the buyer
- Address
- PSI Paul Scherrer Institut Vertreten durch Sektion Immobilien Forschungsstraße 111 Villigen-PSI 5232 Switzerland
- Contact
- immobilien@psi.ch
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.