Germany - Construction work

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
11 May 2023
Opportunity publication date
14 April 2023
Category
45000000
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Lot 3 - Main construction lot, 04109 Leipzig, Germany
Construction of the harbor basin and adjacent open spaces as well as a pedestrian bridge including the trades/construction services: Civil engineering (incl. traffic routes, bridge), waste water, surface drainage, drinking water, special civil engineering, hydraulic engineering and heavy current engineering / City of Leipzig, District: Zentrum-WestMain construction works:- Hydraulic engineering, special civil engineering, civil engineeringArea: 3,650 m² (incl. harbor entrance)Soil excavation: approx. 11,750 m³Soil disposal: approx. 20,000 tProportion of dredging: approx. 40 %Drilled piles D: 0.88 m: 273 piecesDrilled piles D: 1.18 m: 67 piecesHead beams StB: 500 m³ concreteBed sealing GTD: approx. 3,500 m² (sealing area)Bed revetment WBS CP 45/125: approx. 1,200 m³- Power engineeringEarth cable NYY-J 5x2.5 to 10mm², length approx. 1,750 mEarth cable NYY-J 5x16mm², length approx. 2,300 mEarth cable NYY-J 5x25mm², length approx. 500 mEarth cable NYY-J 5x35mm², length approx. 200 mEarth cable NYY-J 5x185mm², 50 mCable protection pipes DN 50 - DN 110, length approx. 1.850 mConnection and grounding workDistribution cabinet, H/W/D 1370 x 1465 x 320 mm, protection class IP44, 1 pieceDistribution cabinet, H/W/D 1005 x 585 x 315 mm, protection class IP44, 1 pieceDistribution cabinet, H/W/D 845 x 585 x 315 mm, Protection IP44,Distribution cabinet, H/W/D 1005 x 780 x 315 mm, Protection IP44, 2 pieces- Surface drainage, bypass, TW-, SW-connectionsLaying of RW sewers DN 250 to DN 400, length approx. 390 m, laying depth 1.30 m to 3.00 m, including inspection chambers DN 600 to DN 1000 and connection channels DN 160,laying of a bypass line DN 200 to DN 300, length approx. 200 m, laying depth 1.20 m to 2.40 m, including inspection chambers DN 1000,laying of SW sewers DN 160 to DN 200, length approx. 140 m, laying depth 1.30 m to 1.55 m, including inspection chambers DN 800,laying of TW pipes PE-HD 32 x 3.0 to 50 x 4.6, length approx. 145 m, laying depth 1.20 m, including water meter shaftOpen spacesPavement - asphalt: 2830 m²Pavement - concrete paving braided bond 1830 m²Concrete elements exposed concrete quality: steps, seat steps, special parts with radii and curvesConcrete blocks made to measure 1230 m², total 614 pieces, usually L max. 1.34 mMetal construction: Edging tree cubes Corten steel:- 4 pcs. L = 2.99 m W = 2.24 m H = 0.84 m- 3 pcs. L = 4.34 m W = 2.24 m H = 0.84 m- Railings Corten steel/stainless steel handrails: 3 pcs. L = 3.825 m- Railings Corten steel/stainless steel handrails: 1 pc. L = 5,69 m- Re-installation/adaptation of 7 pcs. existing railing panels L 2,5 m to 2,7 m, H up to 1,4 m- Metal construction: edgingsPower installations:- 8 pcs. Light column KORA LIV/10WU LED,- 18 pcs. pole light SASKIA I FF LED- 2 pcs. pole light SASKIA I DA LED- Manufacturer: Leipziger Leuchten, delivery and installation- BridgeNew construction of bicycle and pedestrian bridge over the access road to the city harbor as monolithic reinforced concrete construction over 1 field. Total length including ramp structures 64 m, span 17.85 m. Bridge area 86 m2. Shell-like curved superstructure and abutment walls in fair-faced concrete class 2. Abutment foundation on cast-in-place concrete bored piles, ramp structures with shallow foundation, horizontal drag slabs. 230 m³ excavation pit depth up to 1.25 m- 440 t stored soil LAGA Z1.2- 120 m³ construction backfill mixed-grained soil- 320 m³ construction backfill foam glass ballast- 50 m in-situ concrete pile Ø 90 cm concrete C30/37 length 10 to 15 m manufacture- 223 m³ reinforced concrete C30/37 for ramps and abutments manufacture- 49 m³ reinforced concrete C35/45 for superstructure manufacture- 58,5 t of reinforcing steel B500B- 130 m of structural steel railings with stainless steel ropes- 130 m of railings with corrosion protection incl. preparation- 91 m² of waterproofing for the superstructure Preparation- 91 m² waterproofing superstructure preparation, priming, sealing, bituminous welding membrane, protective layer and surface course mastic asphalt MA 8 N- 320 m² anti-graffiti protection construction- 150 m² formation and gravel base course 0/32 Bkl0,3 construction- 180 m² asphalt base course AC 22 T L Bkl0,3/ - surface course AC 8 D L Bkl0,3- 45 m³ frost protection layer- 130 m stainless steel handrail with LED railing lighting- 1 psch surveying services, as-built documents, technical processing of shoring, construction aids, workshop planning- foundation work for the operator's building- excavation of the building pit: approx. 660 m2Disposal Z1.1 to Z2: approx. 403 m2Filling of working area: approx. 258 m3Placement of mineral mixture0/45 mm on geotextile: approx. 288 m2Clean layer with separating layer: approx. 288 m2Floor slabs 40 cm with edge formwork: approx. 288 m2and upstand: approx. 20 mon dry mortar columns (micro piles): approx. 4150 mReinforcement steel B500B: approx. 27 tSewage pipe with bends and inlets: approx. 45 mDrinking water pipes: approx. 24 mElectrical installation Ringerder with clampsand flags: approx. 300 mBar paving with substructure on geotextile: approx. 42.50 m2- Pillar-mounted slewing craneType (planning guideline product):Manufacturer: Vetter Krantechnik GmbH or similarType: Meister M(M32-7.0) or similarincluding maintenance for a period of 4 years- Miscellaneous:- Planning services for works and production planning including the necessary static calculations (e.g. excavation shoring; railings, etc.)- Dewatering work

Opportunity closing date
11 May 2023
Value of contract
to be confirmed

About the buyer

Address
Stadt Leipzig, Amt für Stadtgrün und Gewässer Prager Straße 118 -136 Leipzig 04092 Germany
Contact
asg-vergabestelle@leipzig.de

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?