Germany - Construction of secondary schools
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 19 September 2022
- Opportunity publication date
- 22 August 2022
- Category
- 45214220: Se
- Value of contract
- to be confirmed
- Your guide to exporting
Description
The client, the town of Bergen, is planning the construction of a new technical class building for the regional school Am Rugard.
LOS 9 DRY CONSTRUCTION WORK Partition walls IW/1 Metal stud wall, double-sided two-ply planked, D= 10 cm 188,000 m² IW/2 Metal stud wall, double-sided two-ply planked, D= 10 cm 89,000 m² IW/3 Metal stud wall, double-sided two-ply planked, D= 10 cm 10,000 m² IW/4 Metal stud wall, double-sided two-ply planked, D= 10 cm 18,000 m² IW/5.1 Metal stud wall, double-skin planked on both sides, D= 10 cm 8,500 m² IW/7 Metal stud wall, double-skin planked on both sides, D= 10 cm 31,000 m² Vertical wall cladding as facing between IW/7 17,500 m² Allowance for wall connection to the above-described interior wall IW/1; IW/2; IW/3; IW/4; IW/5.IW/7 250,000 m allowance for ceiling connection to the previously described inner wall IW/1; IW/2; IW/3; IW/4; IW/5; IW/7 80,000 m allowance for floor connection to the previously described inner wall IW/1; IW/2; IW/3; IW/4; IW/5.IW/7 80,000 m Allowance for free-standing wall end to previously described interior wall IW/7 57,000 m Door opening 0.885*2.135 m 11,000 m Door opening 1.01*2.135 m 8,000 m IW/6 Metal stud wall, two-ply planked, D= 15 cm 137,000 m² IW/5 Metal stud wall, two-ply planked, D= 15 cm 10,000 m² Sliding door system incl. sliding door 1,000 m Sliding door system incl. sliding door 1,000 m Allowance for wall connection to previously described interior wall IW/5; IW/6 49,000 m Allowance for ceiling connection to previously described interior wall IW/5; IW6 39,000 m Allowance for floor connection to previously described interior wall IW/5; IW6 39,000 m Allowance for corner connection to previously described interior wall TW/6 23,000 m Door opening 1.51*2.26 m 3,000 m Door opening 1.01*2.135 m 1,000 m Door opening 0.885*2.11 m 1,000 m IW/8 Metal stud wall, F 90, two-layer planking, D= 10 cm 8,000 m² IW 8.1- as described above in partition wall IW/8 but only in the upper wall area 2,300 m² Allowance for wall connection to the above-described interior wall IW/8 8,000 m Allowance for ceiling connection to the above-described interior wall IW/8 3,800 m Allowance for floor connection to the above-described interior wall IW/8 3,800 m Allowance for door reveal to the above-described interior wall IW/8 8,500 m Door opening 2,70*2,65 m 1,000 pcs Create openings in metal stud wall, 0,32 *0,22 m 2,000 pcs. openings in metal stud wall, 0,32 *0,22 m 1,000 pcs. openings in metal stud wall, 0,42 *0,22 m 1,000 pcs. openings in metal stud wall, Dm= 127 mm 3,000 pcs. openings in metal stud wall, Dm= 180 mm 8,000 pcs. openings in metal stud wall, Dm= 200 mm 1,000 pcs. openings in metal stud wall, Dm= 220 mm 8,000 pcs. openings for sanitary/heating lines; Dm up to 80 mm 120,000 pcs Make openings in metal stud wall, 0,52 *0,14 m 6,000 pcs Switch box cut-outs 45,000 pcs Traverse 12,000 pcs Allowance for time-delayed parking 119,000 m Facing walls Attention! VW/1 facing wall as pre-wall installation wall 155,000 m² VW/1.1- facing wall as pre-wall installation wall 9,500 m² VW/2 facing wall as described above in Pos 01.02.01., but only 1,40 m high 35,000 m² VW/3 facing wall as described above in Pos 01.02.01., but with reinforcement 25,000 m² VW/4 facing wall as described above in Pos 01.02.01. but only 0.90 m high 17.000 m² Allowance for wall connection to the previously described facing wall VW/1; VW/1.1;VW 2;VW/4 198.000 m Allowance for ceiling connection to the previously described facing wall VW/1;VW 1.1; 49.000 m Allowance for floor connection to the previously described facing wall VW/1;VW 1.1;VW/4 74.000 m Allowance for corner formation to the previously described facing wall VW/1; VW/1.1;VW /2;VW/4; 59,000 m Allowance as wall shelf in installation pre-wall VW/2; VW /4; 32,000 m Allowance as lateral end facing on facing wall VW/1; VW/3;VW/4; 28,000 m Making openings in pre-wall, Dm 120mm 21,000 pcs Making openings in pre-wall, Dm 80 mm 47,000 pcs Making openings in pre-wall, Dm 50 mm 76,000 pcs Making openings for sanitary/heating cable ducts ; Dm up to 80 mm 120,000 pcs Make openings in pre-wall VW/1; size 150* 51 cm 5,000 pcs Wall openings as allowance 15*15 cm 6,000 pcs Wall openings as allowance 25*15 cm 20,000 pcs Wall openings as allowance approx. 80*85 cm 9,000 pcs Wall openings as allowance 20*20 cm 4,000 pcs Wall openings as allowance 30*30 cm 2,000 pcs Wall openings as allowance 40*60 cm 6,000 pcs Steel inspection flaps 20*20 cm 4,000 pcs Steel inspection flaps 30*30 cm 2,000 pcs Steel inspection flaps 40*60 cm 6,000 pcs Allowance for delayed parking 74,000 m Pipe and manhole linings Attention! SA/1-shaft lining - two-sided with substructure, different sizes 99,000 m² SA /1.1- shaft lining - as described above in item 01.03.1. but three-sided, different sizes 63,000 m² SA/2-shaft lining - two-sided with substructure, different sizes approx. 0.25+0.25 m 10.000 m² Allowance for wall connection to previously described shaft wall SA/1st; SA/1.1; SA//2 308.000 m Allowance for ceiling connection to previously described shaft wall SA/1st; SA/1.1; SA//2 46.000 m Allowance for floor connection to previously described shaft wall SA/1st; SA/1.1; SA//2 46.000 m Allowance for corner formation to previously described shaft wall SA/1st; SA/1.1; SA//2 189,000 m Openings for sanitary/heating piping ; Dm up to 80 mm 30,000 openings in shaft lining, 0,32 *0,22 m 1,000 openings in shaft lining, 0,42 *0,22 m 1,000 openings in shaft lining, Dm= 220 mm 4,000 wall openings as allowance 20*20 cm 7,000 pcs Wall openings as allowance 30*30 cm 2,000 pcs Wall openings as allowance 140*50 cm 1,000 pcs Wall openings as allowance 160*50 cm 1,000 pcs Steel inspection flaps 20*20 cm 7,000 pcs Steel inspection flaps 30*30 cm 2,000 pcs Inspection door; 2-leaf; 1,40*0,50 m 1,000 pcs Inspection door; 2-leaf; 1,60*0,50 m 1,000 pcs Allowance for time-delayed parking 45,000 m suspended ceilings Attention! UD/1- suspended ceiling perforated acoustic ceiling with circumferential smooth frieze 379,000 m2 UD/1.1-suspended ceiling as acoustic ceiling as described above in pos. 01.04.01, but suspension height 18 cm 60,000 m² UD/1.2-suspended ceiling as acoustic ceiling as described above in pos. 01.04.01, but suspension height 28 cm 49,000 m² UD/1.3 suspended ceiling as acoustic ceiling as described above in item 01.04.01, but suspension height 38 cm 166,000 m² UD/1.4 suspended ceiling as acoustic ceiling as described above in item 01.04.01, but suspension height 48 cm 38,000 m² UD/1.5 suspended ceiling as acoustic ceiling as described above in Pos. 01.04.01, but suspension height 53 cm 195,000 m² UD/1.6 suspended ceiling as acoustic ceiling as described above in Pos. 01.04.01, but suspension height 63 cm 114,800 m² UD/1.7 suspended ceiling as acoustic ceiling as described above in Pos. 01.04.01, but suspension height 73 cm 16,200 m² UD/1.8 suspended ceiling as acoustic ceiling as described above in Pos. 01.04.01, but suspension height 84 cm 119,000 m² UD/2- unperforated suspended ceiling, suspension approx. 23 cm, on truss ceiling68,000 m² UD/2.1- unperforated suspended ceiling as described above in item 01.04.10, but suspension height 18 cm 12,500 m² UD/2.2- unperforated suspended ceiling as described above in item 01.04.10, but suspension height 28 cm 5,000 m² UD/2.3- unperforated suspended ceiling as described above in item 01.04.10, but suspension height 38 cm 26,000 m² UD/2.4- unperforated suspended ceiling as described above in item 01.04.10, but suspension height 48 cm 7,500 m² UD/2.5- unperforated suspended ceiling as described above in item 01.04.10, but suspension height 53 cm 3,000 m² UD/2.6- unperforated suspended ceiling as described above in item 01.04.10, but suspension height 63 cm 25,000 m² UD/2.8- unperforated suspended ceiling as described above in Pos. 01.04.10, but suspension height 84 cm 46,000 m² additional roller scaffold refectory 164,000 m² UD 3- unperforated suspended ceiling, suspension approx. 0.28; 0.53; 0.73m, to truss ceiling; 148,000 m² vertical ceiling148,000 m² vertical ceiling cladding on skylight domes 14,000 m² opening in suspended ceilings approx. 3.60* 1.10 m 7,000 pcs. opening in suspended ceilings approx. 0.50* 0.70 m 14,000 pcs. opening in suspended ceilings approx. 400x 400 mm ventilation openings 14,000 pcs Create opening in suspended ceilings approx. 250 x 250 mm ventilation openings 8,000 pcs Create opening in suspended ceilings Dm = approx. 130 mm ventilation openings 31,000 pcs Reinforce suspended ceiling construction for Elt components 152,000 pcs Create opening approx. 200x200 mm, incl. inspection flap 11,000 pcs Create opening approx. 400x400 mm, incl. inspection flap 50,000 pcs Create opening approx. 300x300 mm, incl. inspection flap 37,000 pcs Create opening approx. 300 x 500 mm, incl. inspection flap 3,000 pcs Create opening approx. 300 x 700 mm, incl. inspection flap 4,000 pcs Create opening approx. 600 x 600 mm, incl. inspection flap 9,000 pcs Allowance for sliding wall connection to ventilation units 98,000 m Inspection flap with hard gypsum board 12,5; 600*600 mm; 1,000 pcs Wall absorber Attention! Execution System description- Acoustic wall panel system with surrounding frame WA type V1- Wall absorber vertical 17,000 pcs WA type V2- Wall absorber vertical 5,000 pcs WA type V2.B- Wall absorber vertical - low frequency absorber 5,000 pcs WA Type V3- Wall absorber vertical 5,000 pcs WA Type V4- Wall absorber vertical 4,000 pcs WA Type V6- Wall absorber vertical 1,000 pcs WA Type V12- Wall absorber vertical 1,000 pcs WA Type H1- Wall absorber horizontal 7,000 pcs WA type H2- wall absorber horizotal 7,000 pcs WA type H3- wall absorber horizotal 4,000 pcs workshop building roof insulation of workshop, between wooden trusses 47,000 m² vapor barrier layer 47,000 m² unperforated suspended ceiling, direct suspension, on wooden trussStb.-ceiling; 47,000 m² hourly labor hourly labor, foreman 1,000 h hourly labor, skilled labor 1,000 h hourly labor, helper 1,000 h
- Opportunity closing date
- 19 September 2022
- Value of contract
- to be confirmed
About the buyer
- Address
- Stadt Bergen auf Rügen Markt 5/6 Bergen 18528 Germany
- Contact
- hochbau@stadt-bergen-auf-ruegen.de
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.