Germany - Construction of a flood protection dike. New construction of a 2-zone dyke on a
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 17 January 2025
- Opportunity publication date
- 09 December 2024
- Value of contract
- to be confirmed
- Your guide to exporting
Description
Construction of a flood protection dyke.
New construction of a 2-zone dyke over a length of approx. 400 m with an average height of 1.40 m, which extends from station 3+180 as terrain modeling with crown path (average height 0.60 m) along the Mahlgera to the Kühnhausen railroad embankment.
The dyke defense path runs continuously on the dyke crown\/raised path and is paved with asphalt concrete. At the end of the measure area, at the Kühnhausen railroad embankment, it merges into the turning point. At stations 2+800 and 3+070, an embankment ascent and crossing will be created.
15,000 m2 topsoil removal
1,000 m3 installation of filter material \/ gravel belt
10,000 m3 Installation of retaining body material
8,000 m2 geotextile
7,500 m3 Application of topsoil \/ arable soil Dyke, terrain modeling and dyke protection strip
750 m2 Asphalt road construction
2,000 m2 path with gravel road shoulder
1,800 m3 STS \/ FSS
- Opportunity closing date
- 17 January 2025
- Value of contract
- to be confirmed
About the buyer
- Address
- Freistaat Thüringen, c/o Thüringer Landgesellschaft mbH