United States - CA FTNP SEKI 13(2) Mineral King Road

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
06 November 2024
Opportunity publication date
25 October 2024
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

THIS IS AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE AVAILABLE
 
Full and Open Competition with HUBZone price preference 

PROJECT NUMBER: CA FTNP SEKI 13(2) 
PROJECT NAME: MINERAL KING ROAD 
PROJECT DESCRIPTION: 
The project proposes to rehabilitate up to 12.09 miles of Mineral King Road located within Sequoia and Kings Canyon National Park (SEKI). The project is located east of Visalia in Tulare County, CA. 
SCOPE OF THE WORK: 
The scope includes pulverization of the existing pavement, aggregate base placement, and asphalt paving of the roadway. Parking lots will be rehabilitated or paved to improve visitor access. Soldier pile walls, soil nail walls, and areas of special rock embankment will be constructed throughout the project to stabilize the roadway. The project also includes drainage improvements such as ditch paving and grading, inlet installation, culvert replacement, and inlet and outlet protection measures. 
The Mineral King Road Project is in remote mountainous terrain with areas of limited roadway bench width. Public access will have to be maintained during construction with intermittent allowable closures depending on season and time. The road is inaccessible during winter due to extreme weather and snowpack. The project is in an environmentally sensitive resource area within the National Park Service. 

PRINCIPAL WORK ITEMS: 
22,500 LF Ditch Excavation 
1,900 CY Rip Rap 
700 CY Special Rock Embankment 

6,500 Tons Roadway Aggregate, Method 2 
7.5 Miles Full Depth Reclamation, Method 2 
4.5 Miles Full Depth Reclamation, Method 2 with Cement 
26,000 Tons Asphalt Pavement 
380 LF Steel H Piles, In Place 
9,800 LF 24" to 48" Culverts 
70 Each Inlet (Concrete Box Inlet) 
37,000 LF Paved Ditch, Asphalt 
80 Each Dry Stacked Headwall 
ANTICIPATED SCHEDULE: 
Preshow Onsite Meeting - October 2024 
Advertisement - October 2024 
Construction - April 2025 through October 2027 
Estimated Cost Range:  $25M to $35M

Opportunity closing date
06 November 2024
Value of contract
to be confirmed

About the buyer

Address
6982AF CENTRAL FEDERAL LANDS DIVISI

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?