The elevator that serves the Airport Traffic Control Tower (ATCT) at the Eugene (EUG) Airport (Eugene, OR) was installed in 1986. The elevator is an electric basement geared traction elevator has a 2500-pound car weight rating with a speed 150 Feet Per Minute (FPM) that serves 5 floors and stops. The elevator is the primary means of vertical transportation for the building and is the only elevator that serves the ATCT.
This elevator is in operational condition. This project will replace aging components including but not limited to INSERT FROM REPORT. The project will also bring the elevator up to the most recent version of the ASME A17.1 elevator code.
- Opportunity closing date
- 10 March 2024
- Value of contract
- to be confirmed
About the buyer
- Address
- 697DCK REGIONAL ACQUISITIONS SVCS UNITED STATES
- Contact
- rodgers.l.cox@faa.gov
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.