United States - B-21 East Alert Apron
For more information and to make a bid you will need to go to the third party website.
Details
Provided by
- Opportunity closing date
- 18 February 2025
- Opportunity publication date
- 29 January 2025
- Value of contract
- to be confirmed
- Your guide to exporting
Description
View Changes Am_0001 Posted on 28JAN25 - See Amendment and attachments.---This project is a design-bid-build (DBB) construction project that will provide four (4) new pre-engineered metal Environmental Protection Shelters (EPS), approximately 20,000 SF each. EPS?s are sized to fit the B-2A ?Spirit? aircraft with space to perform general aircraft maintenance. The project also includes associated airfield and ground support equipment (GSE) paving. Supporting facilities include two (2) maintenance kiosks, approximately 160 SF each, providing electrical and communication infrastructure to the EPS?s. Additional site features include blast deflectors, PL-3 boundary fencing and lighting, and an entry control point (ECP). This project will include a space or spaces constructed to AFI 16-1404 requirements.Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. Each facility must be compatible with applicable DoD, Air Force, aircraft, and base design standards. In addition, sustainable (green) construction materials and techniques shall be used where cost effective and/or where specified. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria.Special construction and functional requirements: The project will be constructed on / near the existing Alert Apron at EAFB. As such, the project will be constructed adjacent to ? and may be required to integrate with active airfield operations. It will also be constructed adjacent to other active B-21 facility construction sites. Demolition of existing facilities, utilities, and infrastructure ? to include hazardous materials contaminated apron and soils may be required. New airfield apron will be designed in compliance with UFC 3-260-02 and will be constructed in compliance with UFGS 32 13 14.13.
- Opportunity closing date
- 18 February 2025
- Value of contract
- to be confirmed
About the buyer
- Address
- W071 ENDIST OMAHA
The deadline to apply for this opportunity has passed.
Visit the
opportunities page
to find another.