Find export opportunities will close on 31st January 2026

You can still apply for listed opportunities but we will not be adding anymore

Germany - Earthworks and drainage work; execution schedule; construction schedule psch 1.00

For more information and to make a bid you will need to go to the third party website.

Details

Provided by Open Opps
Opportunity closing date
20 February 2025
Opportunity publication date
01 February 2025
Value of contract
to be confirmed
Your guide to exporting
Report opportunity

Description

Earthworks and drainage works; Execution schedule; Construction schedule psch 1,000; Earthworks; Staking out; Rough staking out of BE areas psch 1,000; Production of BE areas, remove topsoil, store laterally Storage, 30 cm: m²: 315,000; Geotextile as separating layer m²: 312,900; Soil installation, excavation base, concrete recycling m³: 276,000; Demolition of BE areas; Note on execution; Demolition of concrete recycling m³: 276,000; Removal of geotextile: m²: 312,900; Covering topsoil, stored, 30 cm m²: 315,000; Drainage work; PE pipe in outdoor area; PE pipe in outdoor area; PE 100 RC solid wall pipe for drinking water, OD 25 mm m: 60,000; Connection fitting d 25 mm x 3\/4" IG: pc: 2,000; T-piece 25 mm x 1\/2" IG x 25 mm: pc: 1,000; Coupling 25 mm x 25 mm as compression fitting suitable for pc: 1,000; End cap d 25 mm as Plasson compression fitting suitable for: St: 2,000; KFE tap 1\/2 "AG brass: St: 1,000; Manhole ring with rebate without riser Ø60 cm x H 50 cm: St: 2,000; Recess in manhole ring wall for PE pipe St: 2,000; BeGu manhole cover, class B: pc: 1,000; Rigole northwest; box trenches; infiltration trenches: pc: 42,000; End wall grid made of PP 80 x 33 cm: pc: 12,000; End wall adapter PP 80 x 33 cm connection DN 200: St: 1,000; Block connector for single-layer installation St: 45,000; System shaft for infiltration trenches H 66 cm St: 3,000; Manhole support pipe DA 600, without inlet, length 2.0 m: St: 3,000; Double socket for manhole support pipe DA600: St: 3,000; Profile sealing ring with double lip to DIN EN 681-1: St: 3,000; DOM sealing ring for manhole pipe DA 600 St: 4,000; Solids collector DA 600: St: 4,000; Support rings 4 - 15 cm St: 3,000; BeGu manhole cover, class B: St: 4,000; Specified infiltration trench fleece: m2: 105,000; Planar support made of gravel 2- 8 mm: m2: 44,000; Rainwater purification shaft up to 1000m², lateral inlet: St: 1,000; BeGu manhole cover, class B: 4,000. Inlet: pc: 1,000; South infiltration trench; Box infiltration trenches; Infiltration trench infill: pc: 30,000; PP 80 x 33 cm end wall grid: pc: 12,000; PP 80 x 33 cm end wall adapter DN 200 connection: pc: 1,000; Block connector for single-layer installation pc: 33,000; System manhole for packed trenches H 66 cm St: 3,000; Manhole support pipe DA 600, without inlet, construction length 2.0 m: St: 3,000; Double push-in sleeve for manhole support pipe DA600: St: 3,000; Profile sealing ring with double lip to DIN EN 681-1: St: 3,000; DOM sealing ring for manhole pipe DA 600 St: 3,000; Solids collector DA 600: St: 3,000; Support rings 4 - 15 cm St: Inlet St: 1,000; Solids collector DA 400: St: 1,000; Manhole cover class B 125, Lftg, DA 400 St: 1,000; Rainwater pipes in outdoor areas; Buried wastewater pipes from KG 2000, T up to 1.75; Pipe as described DN 100 m: 33,000; Pipe as described DN 125 m: 24,000; Pipe as described DN 150 m: 117,000; Pipe as described DN 200 m: 63,000; Sand bed for pipe described above m: 269,000; Surcharges for fittings Bends of all grades; Bend DN 100 St: 29,000; Bend DN 125 St: 31,000; Bend DN 150 St: 60,000; Bend DN 200 St: 8,000; Branch no matter or reduced DN 100: St: 1,000; Branch no matter or reduced DN 125: St: 1,000; Branch no matter or reduced DN 150: St: 26,000; Branch no matter or reduced DN 200: St: 11,000; Double socket DN 100 St: 9,000; Double socket DN 125 pc: 9,000; Double socket DN 150 pc: 10,000; Double socket DN 200 pc: 4,000; Reducer DN 125 pc: 1,000; Reducer DN 150 pc: 2,000; Reducer DN 200 pc: 2,000; End cap DN 100 pc: 9,000; End cap DN 125 pc: 9,000; End cap DN 150 pc: 22,000; End cap DN 200 pc: 2,000; Fitting DN 100 pc: pc: 18,000; Fitting DN 125: St: 18,000; Fitting DN 150: St: 44,000; Fitting DN 200: St: 8,000; Positioning base pipe connection for downpipe: St: 18,000; Positioning base pipe for gutter connection St: 22,000; Pressure and leakage test for wastewater pipe systems St: 2,000; RW inspection chamber 1 (1.6m) St: 1,000; RW inspection chamber 1 (1.6m) St: 1,000; RW inspection chamber 1 (1.6m) St: 1,000; RW inspection chamber 1 (1.6m) St: 1,000; RW inspection chamber 1 (1.6m) St: 1,000; RW inspection chamber 1 (1.6m) St: 1,000; RW inspection chamber 1 (1.6m) St: 1,6m)... (The text has been cut off. You can find the entire text in the PDF file)

Opportunity closing date
20 February 2025
Value of contract
to be confirmed

About the buyer

Address
Erzdiözese München & FreisingKdÖR7.2.2 Vergabestelle Bau

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?